Confidential Offering · Accredited Investors OnlyAtoka County, Oklahoma · PSO Service Territory

Energy Source Holdings

North Hills Energy Park · Atoka AI Campus
Phases I & II now open
Powered Land · Behind-the-Meter Generation

Contracted power on a ready pad, with a gigawatt of gas at the fence line.

North Hills Energy Park is an AI-infrastructure campus in Atoka County, Oklahoma, developed on land held by a county public trust. Phase I delivers 13 MW of contracted utility power on a ready, fenced pad — deployable now, without a grid queue. Phase II scales the campus with behind-the-meter gas generation of up to 500 MW.

Both phases are now open for off-taker and investor subscription. Natural gas supply at the site boundary is confirmed to one gigawatt, so Phase II sits comfortably inside available supply rather than depending on new pipeline capacity.

The campus is developed on the same asset-backed discipline that governs every Energy Source Holdings programme: contracted revenue, a real property interest, and no dependence on an interconnection queue for the behind-the-meter build.

Request Project Materials →
Phases I & II

Two phases, both open, deliberately sequenced

Phase I monetises power that already exists. Phase II builds generation behind the meter at a scale the gas supply already supports. A tenant can contract for either or for both.

Phase IDetail
Capacity13 MW contracted utility power
SourceUtility service, PSO territory
SiteReady, fenced pad — graded and served
StatusOpen — deployable now
Time to revenueTargeted within 6–9 months
Lease term10 years
Phase IIDetail
CapacityUp to 500 MW behind the meter
SourceGas reciprocating engine generation
FuelWithin the 1 GW confirmed at the boundary
StatusOpen — capacity and phasing to be agreed
InterconnectionNone required — behind the meter
Lease term15 years from its delivery date
Nothing is reserved until it is agreed and secured. Phase II capacity, phasing, rent and delivery are agreed and documented by amendment. The campus grants no option, right of first refusal or right of first offer over Phase II capacity, over additional Phase I pad capacity, or over any other part of the campus. Commercial terms, credit requirements and security are set out in the project materials.
The Site

Powered land, held through a public trust

Tenure
County public trust

Campus land is held by the Atoka County Industrial Development Authority, a public trust, under a development structure documented in the project materials — aligning the project with the county’s own industrial development mandate.

Power
Contracted, not queued

Phase I power is contracted utility service to a pad that is already graded and fenced. Phase II is generated on site behind the meter, so it does not wait on a transmission interconnection study or queue position.

Fuel
One gigawatt confirmed

Natural gas availability at the site boundary is confirmed to one gigawatt of generation — meaning the full 500 MW Phase II sits inside existing confirmed supply, with headroom above it.

Local Support
Documented municipal backing

The project has documented support from the City, reflected in the development approvals and the public-trust land structure rather than in expressions of intent alone.

Delivery
Contracted general contractor

Construction is delivered under an executed master services agreement and scope of work with the project’s general contractor, including procurement, rather than under a non-binding proposal.

Structure
Project entity

The campus is developed through North Hills Energy Park, with Energy Source Holdings acting as Promoter of the Securitization Platform owned by Energy Sources Securities through which participation is offered.

Why Atoka

The scarce commodity is time-to-power

Speed
Deployable now

Phase I power is contracted and the pad is ready, so a tenant can be energised while comparable sites are still waiting on an interconnection position.

Scale Path
13 MW to 500 MW

A tenant can start at 13 MW and scale to a half-gigawatt on the same campus, under the same landlord, without relocating or re-permitting a new site.

Cost Structure
Behind the meter

Phase II generation sited at the load avoids transmission and delivery charges and the queue that governs grid-served alternatives.

Development Plan

Phase I first, Phase II on agreement

Phase I
Contract & Energise

Lease execution against the campus readiness notice, tenant fit-out on the served pad, and energisation of 13 MW of contracted utility power — revenue targeted within 6 to 9 months.

Phase II — Agreement
Capacity & Documentation

Phase II capacity, phasing, rent and delivery dates agreed and documented by amendment, with security set at that time against the contracted Phase II capacity.

Phase II — Build
Generation Delivered

Behind-the-meter gas generation built out to the agreed capacity, up to 500 MW, within the gas supply already confirmed at the site boundary.

Request the Project Materials

The site package, survey and parcel detail, power and gas documentation, the lease and credit structure, construction contracts and the full risk factors are available to verified accredited investors and qualified off-takers on request.

Request Materials →
All ProgramsPower InfrastructurePhases I & IIThe SiteWhy AtokaRequest Materials
© 2026 Energy Source Holdings · For qualified investors only
This page is a summary for informational purposes only and does not constitute an offer to sell or a solicitation of an offer to buy any security, nor a binding offer to lease. Any offer will be made only by means of confidential offering materials to verified accredited investors pursuant to applicable exemptions, and any lease only by an executed written agreement. Energy Source Holdings acts as Promoter of the Securitization Platform owned by Energy Sources Securities. The project is in the development stage; capacities, timelines, gas availability and all financial figures are estimates and projections subject to permitting, contracting, counterparty performance and market conditions, are not guaranteed, and may not be achieved. Phase II capacity is not reserved or committed until agreed and documented by amendment. Participation involves substantial risk, including the risk of total loss of investment. See the risk factors in the project materials.
Site by Aptimized