EnergySource1Green Infrastructure
Structure & Payment Security

A real-asset security package, backstopped by a bank guarantee.

Bondholders sit senior-secured against project assets and LC-backstopped PPA cash flows, with a sovereign utility as off-taker and equity partner.

Transaction structure

Seller / SPVTroGreen Energy Moçambique, Lda — builds and operates each plant and holds title.
Off-takerElectricidade de Moçambique (EDM) under a 25-year USD PPA, and a 5% equity stakeholder in the asset-owning SPV.
BondholdersSenior secured against project assets and LC-backstopped PPA cash flows.
SponsorTrophy Trackers Africa / Green Utilities (UK).

Payment security

Tier-one bank letter of credit

EDM’s payment obligations are backstopped by an irrevocable standby Letter of Credit (the PPA’s “Guaranteed Credit Support”) issued by a bank meeting an A-/A3 minimum rating and guaranteed by a French entity, covering the Credit Support Amount for roughly 17 years from financial close before stepping down.

Aligned sovereign off-taker

EDM is both the contracted buyer of power and a 5% equity holder in the SPV — aligning the national utility’s interests with the project’s performance and bondholders’ security.

Use of proceeds & why it’s bankable

Proceeds fund EPC, grid connection, development, and a debt-service reserve via milestone-linked draws. The bankability rests on a hard-currency, CPI-linked tariff; a sovereign-utility off-taker with an LC plus French guarantee backstop; EDM equity alignment; and a replicable model proven on the Gaza lead asset.

Both assets sit within the EDM–TroGreen 200 MW national program (MoU, 2018), providing a pipeline beyond the initial 80 MW.
Request bond memorandum →